Delta Dental
Delta Dental is a single level office space that was a designed and built with Sustainability and functionality as the main driver. 22000 SF of CLT roof deck was installed over Glulam Beams.
The CLT roof deck of the Delta Dental Call Center in Colville, WA was completely installed in 4 days. The contractor thought the 22,000 sq. foot roof system would be in place in 5 days. Fabrication of the beams and CLT for immediate fit on to the job site is critical for speed, safety, and accuracy.
-
Project Location
Colville, WA
-
Building Type
Commercial - Office
-
Square Feet
22,000
-
Mass Timber Scope
CLT Roof
Glulam Beams -
Sustainability
North American forests grew this much wood in 40 seconds.
This project kept 311 metric tons of carbon from entering the atmosphere.
This is the equivalent of keeping 67 cars off the road or providing clean power to 60 houses for a year.
-
Vaagen Timbers Services
BIM, Detailing, and 3D Modeling Work
Conceptual Estimating
Conceptual Project Development
Design Assist
CLT Panel Manufacturing
Edge Chamfering / Detail Work
Factory Applied Protective Coatings
Glulam Beam and Column Manufacturing
Hardware Installation
Mass Timber Hardware Connections Supply
Mass Timber Milling / CNC Works -
Architect
HDG Architecture
-
Engineer
DCI
-
Contractor
Bouten Construction
-
Mass Timber Installer
Foust Fabrication